TESTING & COMMISSIONING

*

Complete the form below if you would like a free no-obligation quote for Potensia System

  • Free Quote within 24 hours
  • No obligation – Expert advice
  • Friendly advice available +971 4-770-8049








Testing procedures are recommended during the installation of new hardware when troubleshooting for problems and generally during repairs or routine checks. With Potensia systems, you well knowing that our results and conclusions from tests conducted are founded on the highest quality

and are thus worthy of trust. FATs (better known as Factory Acceptance Tests) are organized for projects which by virtue of their complexity and intricacy are required to be tested abroad. SATs or Site Acceptance Tests, as you guessed, are performed by specialists before jobs are released finally to our clients. Unit Tests, UTs, run on items before they are taken into the laboratory and installed. To show you how thorough we are and how concerned we are about the wellbeing and satisfaction of our clients, we set a minimum of 14 days aside for proper and in-depth testing of equipment by our technical staff.